RIJOMAC COOLING LOAD ENGINE - 12 STEP ENGINEERING WORKFLOW
1Project
2Geometry
3Design
4Envelope
5Internal
6Ventilation
7Infiltration
8Safety
9Load
10Supply Air
11Selection
12Report
1. Project Information
2. Room Geometry
3. Design Conditions
6. Ventilation
4A. Building Envelope - Glass
Default solar factors: N 23, E 80, S 68, W 94, NE 66, SE 70, SW 81, NW 74.
4B. Building Envelope - Wall / Roof / Floor
5. Internal Loads
7-8. Infiltration & Safety Factors
11. Equipment Selection
12. Report Setting
Ready.
9-10. Cooling Load Summary
Cooling Load0 TR
Cooling Load0 kW
Supply Air0 CFM
Recommended Unit0 TR
| Area | 0 |
|---|---|
| Volume | 0 |
| Fresh Air | 0 |
| Sunlight Gain | 0 |
| Transmission Gain | 0 |
| Internal Sensible Gain | 0 |
| Room Sensible Heat | 0 |
| Outside Air Sensible | 0 |
| Room Latent Heat | 0 |
| Outside Air Latent | 0 |
| Infiltration Sensible | 0 |
| Grand Total Heat | 0 |
| SHR | 0 |
| Recommended Equipment | 0 |
Engineering Note:
Hasil ini adalah preliminary cooling load. Untuk desain final perlu validasi data material, occupancy, schedule, ventilation standard, infiltration, duct heat gain, fan heat, dan selection equipment.
Hasil ini adalah preliminary cooling load. Untuk desain final perlu validasi data material, occupancy, schedule, ventilation standard, infiltration, duct heat gain, fan heat, dan selection equipment.