RIJOMAC SYSTEM
Controlled Environment Engineering
RJM-ACH-001 v2.0
1. Project Information
Engineering Notes
2. Calculation Input
Ready.
3. ACH Result
Room Volume-
Supply Airflow-
Calculated ACH-
Required Airflow-
| Area | - |
|---|---|
| Target ACH | - |
| Airflow in CFM | - |
| Airflow in m3/h | - |
| Exhaust Airflow | - |
| Air Balance | - |
| Engineering Check | - |
Target Achievement
-
Engineering Note:
ACH adalah indikator jumlah pergantian udara per jam. Nilai ACH harus dibaca bersama airflow pattern, filtration, pressure cascade, heat load, noise, dan balancing aktual.
ACH adalah indikator jumlah pergantian udara per jam. Nilai ACH harus dibaca bersama airflow pattern, filtration, pressure cascade, heat load, noise, dan balancing aktual.
4. Engineering Report
5. Room Type Reference Library
| Room Type | Typical Preliminary ACH | Engineering Note |
|---|---|---|
| Office / Comfort Room | 4-8 ACH | Untuk kenyamanan, load dan fresh air lebih dominan daripada ACH. |
| General Laboratory | 6-12 ACH | Tergantung exhaust, safety, dan bahan yang digunakan. |
| Cleanroom ISO 8 | 10-25 ACH | Tergantung particle load, recovery time, dan supply diffuser. |
| Cleanroom ISO 7 | 30-60 ACH | Tergantung layout, process, filter HEPA, dan commissioning. |
| Negative Pressure Isolation | Min. 12 ACH | Perlu pressure cascade dan exhaust yang benar. |
| BSL-2 Laboratory | 6-12 ACH | Tergantung biosafety risk assessment dan exhaust strategy. |
| Cold Storage / Cold Room | Air circulation based | Lebih fokus pada temperature uniformity, throw, dan product load. |