RIJOMAC SYSTEM
Controlled Environment Engineering
━━━━━━━━━━━━━━━━━━━━━━
DAFTAR ISI
KATA PENGANTAR
BAB 1
PENGENALAN AIR HANDLING UNIT (AHU)
1.1 Apa Itu AHU
1.2 Fungsi AHU dalam Sistem HVAC
1.3 Komponen Utama AHU
1.4 Jenis-Jenis AHU
1.5 AHU vs FCU vs RTU
1.6 Mengapa Konfigurasi AHU Tidak Selalu Sama
1.7 Ringkasan Bab
━━━━━━━━━━━━━━━━━━━━━━
BAB 2
KONFIGURASI AIR TREATMENT SYSTEM
2.1 Konsep Pengolahan Udara
2.2 Air Treatment Sequence
2.3 Fresh Air dan Return Air
2.4 Filtration Stage
2.5 Cooling Stage
2.6 Heating Stage
2.7 Air Distribution Stage
2.8 Configuration Matrix
2.9 Ringkasan Bab
━━━━━━━━━━━━━━━━━━━━━━
BAB 3
FILTRATION SYSTEM
3.1 Prinsip Filtrasi Udara
3.2 Pre Filter
3.3 Medium Filter
3.4 Fine Filter
3.5 HEPA Filter
3.6 ULPA Filter
3.7 Filter Efficiency
3.8 Pressure Drop Filter
3.9 Filter Replacement Strategy
3.10 Ringkasan Bab
━━━━━━━━━━━━━━━━━━━━━━
BAB 4
COOLING COIL & DEHUMIDIFICATION
4.1 Prinsip Pendinginan Udara
4.2 Cooling Coil DX
4.3 Cooling Coil Chilled Water
4.4 Sensible Heat
4.5 Latent Heat
4.6 Dehumidification Process
4.7 Coil Selection
4.8 Drain Pan Design
4.9 Coil Maintenance
4.10 Ringkasan Bab
━━━━━━━━━━━━━━━━━━━━━━
BAB 5
PRE-HEATER DAN RE-HEATER
5.1 Mengapa AHU Membutuhkan Heater
5.2 Fungsi Pre-Heater
5.3 Fungsi Re-Heater
5.4 Freeze Protection
5.5 Humidity Control
5.6 Temperature Reset
5.7 Heater Selection
5.8 Ringkasan Bab
━━━━━━━━━━━━━━━━━━━━━━
BAB 6
UV-C SYSTEM DALAM AHU
6.1 Prinsip UV-C
6.2 UV-C untuk Coil Protection
6.3 UV-C untuk Air Sterilization
6.4 Penempatan UV-C
6.5 Kelebihan dan Keterbatasan UV-C
6.6 Perawatan UV-C
6.7 Ringkasan Bab
━━━━━━━━━━━━━━━━━━━━━━
BAB 7
FAN SYSTEM
7.1 Prinsip Airflow
7.2 Forward Curved Fan
7.3 Backward Curved Fan
7.4 Plug Fan
7.5 EC Fan
7.6 Fan Static Pressure
7.7 Airflow dan ACH
7.8 Fan Selection
7.9 Vibration Control
7.10 Ringkasan Bab
━━━━━━━━━━━━━━━━━━━━━━
BAB 8
PSYCHROMETRICS UNTUK AHU
8.1 Sifat Udara
8.2 Dry Bulb Temperature
8.3 Wet Bulb Temperature
8.4 Relative Humidity
8.5 Dew Point
8.6 Psychrometric Chart
8.7 Cooling Process
8.8 Heating Process
8.9 Dehumidification Process
8.10 Ringkasan Bab
━━━━━━━━━━━━━━━━━━━━━━
BAB 9
AHU UNTUK CLEANROOM
9.1 Persyaratan Cleanroom
9.2 ISO 14644
9.3 Air Change Rate
9.4 Pressure Cascade
9.5 HEPA Filtration
9.6 Cleanroom AHU Configuration
9.7 Contoh Desain
9.8 Ringkasan Bab
━━━━━━━━━━━━━━━━━━━━━━
BAB 10
AHU UNTUK RUMAH SAKIT
10.1 Medical HVAC Overview
10.2 Operating Room
10.3 Isolation Room
10.4 ICU
10.5 CSSD
10.6 Airborne Infection Control
10.7 Medical AHU Configuration
10.8 Ringkasan Bab
━━━━━━━━━━━━━━━━━━━━━━
BAB 11
AHU UNTUK LABORATORIUM DAN BSL
11.1 Laboratory HVAC
11.2 Biosafety Laboratory
11.3 Containment Principle
11.4 Negative Pressure System
11.5 HEPA Requirements
11.6 BSL AHU Configuration
11.7 Ringkasan Bab
━━━━━━━━━━━━━━━━━━━━━━
BAB 12
AHU UNTUK INDUSTRI FARMASI
12.1 GMP HVAC Concept
12.2 Grade A, B, C, D
12.3 Temperature & RH Control
12.4 Cross Contamination Control
12.5 Pharmaceutical AHU Configuration
12.6 Ringkasan Bab
━━━━━━━━━━━━━━━━━━━━━━
BAB 13
AHU UNTUK INDUSTRI MAKANAN
13.1 Hygienic HVAC
13.2 Temperature Control
13.3 Humidity Control
13.4 Condensation Prevention
13.5 Food Industry AHU Configuration
13.6 Ringkasan Bab
━━━━━━━━━━━━━━━━━━━━━━
BAB 14
SELEKSI DAN PERANCANGAN AHU
14.1 Data yang Dibutuhkan
14.2 Airflow Calculation
14.3 Cooling Load
14.4 Static Pressure Calculation
14.5 Filter Selection
14.6 Fan Selection
14.7 AHU Sizing
14.8 Ringkasan Bab
━━━━━━━━━━━━━━━━━━━━━━
BAB 15
TESTING, ADJUSTING & BALANCING (TAB)
15.1 Airflow Measurement
15.2 Static Pressure Measurement
15.3 Temperature Measurement
15.4 RH Measurement
15.5 Filter Verification
15.6 TAB Documentation
15.7 Ringkasan Bab
━━━━━━━━━━━━━━━━━━━━━━
BAB 16
COMMISSIONING AHU
16.1 Pre-Commissioning Checklist
16.2 Start-Up Procedure
16.3 Functional Testing
16.4 Performance Verification
16.5 Acceptance Criteria
16.6 Commissioning Report
━━━━━━━━━━━━━━━━━━━━━━
BAB 17
OPERASI DAN PERAWATAN
17.1 Daily Inspection
17.2 Weekly Inspection
17.3 Monthly Inspection
17.4 Coil Cleaning
17.5 Filter Replacement
17.6 Fan Maintenance
17.7 UV-C Maintenance
━━━━━━━━━━━━━━━━━━━━━━
BAB 18
TROUBLESHOOTING AHU
18.1 Airflow Rendah
18.2 Coil Beku
18.3 RH Tidak Terkontrol
18.4 Temperatur Tidak Tercapai
18.5 Static Pressure Tinggi
18.6 Filter Cepat Kotor
18.7 Fan Bermasalah
18.8 Checklist Troubleshooting
━━━━━━━━━━━━━━━━━━━━━━
LAMPIRAN
A. Configuration Matrix AHU
B. Filter Classification
C. Psychrometric Reference
D. Cleanroom Quick Reference
E. Hospital HVAC Quick Reference
F. Laboratory HVAC Quick Reference
G. Commissioning Forms
H. Preventive Maintenance Checklist
I. AHU Terminology
J. Engineering Calculation Sheet